ICC signed a contract with The Energy and Water Utilities Regulatory Authority of Tanzania to provide technical assistance for the "Capacity Building for the Energy and Water
Utilities Regulatory Authority (EWURA)", funded by USTDA.
ICC signed a contract with the Instituto Costarricense de Electricidad, from Costa Rica, to carry out the "Technical Feasibility
and International Financial Package for the Hydroelectric Project EL DIQUIS (630 MW)", funded by USTDA.
ICC was just selected by the Corporación Autónoma Regional de Cundinamarca, Colombia to elaborate the methodology for defining the optimal integration of 41 existing municipal services for water
supply, wastewater and sanitation into Regional Public Companies (RPC) and private operators in the Bogotá basin of Colombia. The methodology includes the definition of the optimal location and size
of the RPC, the development of an Information System for their management and communication with impacted communities and an environmental licensing system for recovering the Bogotá basin ecological
conditions.